Integration

You are here

At this stage the main objective is to establish the parameters of the project and ensure the implementation with the least possible risk.
Depending on the project can also build an evolutionary prototype of a component, to study the feasibility of a module or demonstrations to end users.

Goals
• Knowledge of the entire system to build:
◦ Specification and complete validation of requirements and design.
◦ Stabilize Architecture.
◦ Fully define the scope.

• Generate entire development environment based on the system architecture.
◦ Implement riskier functionality of each module.

• Design the project management:
◦ Set the project schedule.
◦ Establish project monitoring strategy.
◦ Design the development plan and establish the monitoring strategy.
◦ Fully define the project baseline.

Critical activities

• Specify Requirement.
• Validate Requirement.
• Confirm with Prototype.
• Prioritize Requirements.
• Define the Scope of the System.
• Define Guidelines for User Interface
• Design the system.
• Describe the system architecture.
• Communicate the design to Implementers
• Integration Plan Iteration.
• Integrate the system.
• Set and control the development.
• Plan the Project.
• Risk management.
• Estimates and measurements.
• Define the project baseline.
• Define and generate the controlled environment.
• Planning laVerificación.
• Specifying test cases.
• Verification Unitarian.
• Define Standards Doc. User.

Non critical activities
• Plan Quality
• Formal Technical Review (RTF's)
• Review deliveries.
• Set Review Process
• Plan Settings
• User Documentation
• Transition Planning.
• Develop training materials.
• Monitoring of the project baseline.